New Development Coverage

New & pre-construction condos on the downtown waterfront.

A curated register of what is actively selling across the corridors I work every day — Harbourfront, Lower Jarvis and East Bayfront. No portal noise, no expired launches. Each project is tracked against resale data from my corridor pages so you can see whether the developer's price sheet actually holds up.

Register verified August 2026 · Updated monthly alongside TRREB corridor data
Status
Corridor
Yonge & Lake Shore · C01 Final release · Occupancy Fall 2026

SkyTower at Pinnacle One Yonge

1 Yonge Street · Pinnacle International

From$1.63M
Storeys106
Suites~958

Canada's tallest residential tower, now topped out, with the final block of suites being released as occupancy approaches. My read: this is an end-user building at these price points — the question isn't the view, it's how the final-release pricing compares to Prestige resales next door. I run that comparison before you sign anything.

East Bayfront · C08 Move-in ready

Aqualuna at Bayside

261 Queens Quay East · Tridel + Hines

From$800s+
Storeys14
OccupancyNow

The fourth and final Bayside building — wave-form architecture, oversized suites, LEED Platinum, and occupancy already underway. My read: boutique scale and large floor plates make this the strongest end-user product on the eastern waterfront, and remaining developer inventory can be negotiated like resale.

Lower Jarvis · C08 Move-in ready

Sugar Wharf — Phase One

Queens Quay E at Freeland · Menkes

Suites1–3 BR
Towers2
OccupancyNow

The LCBO-lands master plan two blocks from my Lower Jarvis listings — Phase One complete, developer suites available, PATH-connected with a school and park in the plan. My read: I know this micro-market suite by suite; before buying developer inventory here, you should see what identical resale and lease comps are doing. I have them.

Harbourfront · C01 Selling · Occupancy 2029

Q Tower

200 Queens Quay West · Lifetime + DiamondCorp

FromLow $600s
Storeys60
Suites~915

One of the last true-waterfront sites west of Yonge, steps from Union and the PATH. My read: the entry price is the story here — but a 2029 occupancy means the deposit structure and interim-occupancy math matter more than the brochure. I model both against today's rents before you commit.

Lower Jarvis · C08 Coming soon

Sugar Wharf — Phase Two

Queens Quay E at Freeland · Menkes

PricingTBA
Towers3
Units2,600+

Three towers planned above a retail podium with an on-site public school — site prep is underway and a launch window is forming. My read: launch pricing on this corridor will be judged against Phase One resales I track monthly. Register with me now and you'll see my comp sheet before the sales office sees you.

No projects match that filter — clear a chip above.
Why buy new with me

The sales office works for the developer.
I work for you.

01

Price sheet vs. reality

Every project on this page is checked against live resale and lease data from my corridor pages. If the developer's per-square-foot ask is above what identical suites trade for today, you'll know before you sign — not at final closing.

02

The math nobody shows you

Deposit structures, interim occupancy fees, development charge caps, assignment rights, HST rebate eligibility. I put the full cost of ownership on one page so the decision is made on numbers, not renderings.

03

After the keys

I lease and resell in these exact buildings. That means a realistic rent number for your interim-occupancy plan, and an exit view grounded in what this corridor actually does — not what a national average says.

Register interest

Get the comp sheet before the sales office gets you.

Tell me which project you're circling. I'll reply with current pricing context, resale comps from the same corridor, and my read on whether launch pricing holds up. No drip campaign — one direct reply from me.

Direct to Eric Geng, Re/MAX City Accord Realty Inc. No mailing list.
New development coverage

Pre-construction, underwritten.

A curated register of what is actively selling on the downtown waterfront — each project checked against resale data from my corridor pages, so you can see whether the developer's price sheet actually holds up.

Register verified
August 2026
Updated with TRREB monthly
Status Corridor 6 projects
Yonge & Lake Shore · C01 Final release · Occ. Fall 2026

SkyTower at Pinnacle One Yonge

1 Yonge Street · Pinnacle International

From$1.63M
Storeys106
Suites~958

Canada's tallest residential tower, now topped out, with the final block of suites released as occupancy approaches. My read: this is an end-user building at these price points — the question isn't the view, it's how final-release pricing compares to Prestige resales next door. I run that before you sign.

East Bayfront · C08 Move-in ready

Aqualuna at Bayside

261 Queens Quay East · Tridel + Hines

From$800s+
Storeys14
OccupancyNow

The fourth and final Bayside building — wave-form architecture, oversized suites, LEED Platinum, occupancy underway. My read: boutique scale and large floor plates make this the strongest end-user product on the eastern waterfront, and remaining developer inventory negotiates like resale.

Lower Jarvis · C08 Move-in ready

Sugar Wharf — Phase One

Queens Quay E at Freeland · Menkes

Suites1–3 BR
Towers2
OccupancyNow

The LCBO-lands master plan two blocks from my Lower Jarvis listings — Phase One complete, developer suites available, PATH-connected with a school and park in the plan. My read: I know this micro-market suite by suite. See what identical resale and lease comps are doing first.

Harbourfront · C01 Selling · Occupancy 2029

Q Tower

200 Queens Quay West · Lifetime + DiamondCorp

FromFrom the low $600s
Storeys60
Suites~915

One of the last true-waterfront sites west of Yonge, steps from Union and the PATH. My read: entry price is the story — but a 2029 occupancy means deposit structure and interim-occupancy math matter more than the brochure. I model both against today’s rents.

Lower Jarvis · C08 Coming soon

Sugar Wharf — Phase Two

Queens Quay E at Freeland · Menkes

PricingTBA
Towers3
Units2,600+

Three towers planned above a retail podium with an on-site public school — site prep underway and a launch window forming. My read: launch pricing here will be judged against Phase One resales I track monthly. Register now and you see my comp sheet before the sales office sees you.

Downtown core · C01 + C08 Off-register

Other Remaining Inventories

Unsold developer stock · multiple buildings

Buildings12+
TypeStanding
PricingOn ask

Completed towers still carrying unsold suites the sales offices no longer advertise — the quietest inventory on the waterfront. My read: standing stock is the one place developers negotiate like a resale seller, because carrying costs are real. Tell me the size and budget and I'll tell you what is genuinely available this week.

The sales office works for the developer. I work for you.

01

Price sheet vs. reality

Every project here is checked against live resale and lease data from my corridor pages. If the developer's per-square-foot ask is above what identical suites trade for today, you'll know before you sign — not at final closing.

02

The math nobody shows you

Deposit structures, interim occupancy fees, development charge caps, assignment rights, HST rebate eligibility. Full cost of ownership on one page, so the decision is made on numbers, not renderings.

03

After the keys

I lease and resell in these exact buildings — a realistic rent number for your interim-occupancy plan, and an exit view grounded in what this corridor actually does, not a national average.